Know the grid before you commit capital.
Check a project's grid risk, and test its revenue case against the market as it really ran.
Illustrative numbers
Your questions, answered.
Unit
Ridge Solar
Solar · 130 MW
Illustrative numbers · Derived
Power flow and line ratingsRidge Solar and its battery, checked in five steps.
From the project's grid risk to the return a lender can rely on, all in supagrid.
- 01
The project
130 MW of solar and a 50 MW battery, proposed beside Ridge Road. The developer's case says it captures $61.00/MWh.
- 02
Its grid risk
Solar farms already on this line lost 9.0% of their output last year, and two constraints did most of the binding.
- 03
Test the revenue case
Rerun last year with the project in it. It captures $52.00/MWh, 14.8% short of the developer's case.
- 04
The return, and the debt
At that price the project returns 7.6%, and covers its debt 1.18 times in its tightest year.
- 05
Where each number comes from
Every figure says where it came from and how it was made, ready for the credit paper.
Substation
Ridge Road
330/132 kV · where it connects
Illustrative names and numbers