Change one thing. Rerun the market. See what happens.

Dispatch, load and power flow modelling on one model of the NEM, connected to commercial outcomes and tested against history.

Illustrative numbers

Power flow, dispatch and commercial modelling, in one workflow.

Separate models for power flows, market dispatch and commercial performance, integrated to help investigate how changes to the power system affect market outcomes and project value.

  • Dispatch

    Rerun market dispatch at five minute resolution to investigate how demand, generator availability, bids and network constraints shape dispatch and regional prices. Examine constraint binding, unit level dispatch and battery behaviour under historical conditions or alternative scenarios.

  • Power flow

    Calculate flows and loading across the connected transmission system, every line and transformer, including those without a published AEMO flow or rating. Allocate demand across substations and assess flows against thermal ratings to find the lines and transformers that are loading up.

    Beta

  • Commercial

    Translate market and operational assumptions into project level financial outcomes. Model revenue, operating and capital costs, PPA structures, financing and project returns, including NPV, IRR, payback and debt coverage. Compare scenarios to understand the commercial implications of changing market conditions.

Three steps, on the real market.

Power system and market modelling tools.

Dispatch and power flow models of the NEM, run in the cloud with the market and the network already built in. They work alongside PSS/E and PLEXOS, not instead of them. Screen projects before the connection studies start, and once a project is operational, test what network changes or an expansion would do to it.

Dispatch

The NEM's five minute dispatch, rerun from AEMO's demand and constraint equations.

Change one thing, such as adding a battery or retiring a unit, and see what it does to prices, dispatch, curtailment and revenue, down to the constraint that bound.

Region · Modelled

South Australia

Thu 24 Sep 2026 · five minutes at a time

Price

AEMO's price beside the model

ActualModelled$/MWh

Heywood interconnector, into SA

AEMO's target beside the model

ActualModelledMW
Highest price, actual$274.7500:40
Highest price, modelled$274.4700:40

ModelledA day the model never saw in development

Power flowBeta

A power flow (or load flow) across the transmission network, with every line, transformer and yard as it stood on the day.

Much of it has no published flow. The model gives every line and transformer a flow, so you see what is loading up early enough to change the plan, and it is being built to give Dispatch limits where none exist yet.

Lines · Modelled

South Morang

Thu 16 Jan 2025 · five minutes at a time

South Morang–Sydenham No. 1 · 500 kV

AEMO's reading every five minutes

ActualModelledMVA, toward Sydenham

South Morang F2 transformer

No measured flow from AEMO

ModelledMW
F2 peak flow497 MW19:00
F2 peak loading41%of its 1,200 MVA rating

ModelledA typical day for this line, not its best

Built on every five minute interval, every bid and rebid, every constraint, and a network graph in which every line, transformer and connection carries the dates it was in service.

Next in modelling.

  • Coming soon

    Line edits

    Add or upgrade a line, then rerun.

Have a change in mind?